Gas Pipeline Inventory & GPS Survey project

Project Details:
  • Client: Gas Malaysia Berhad (GMB), Malaysia
  • Date: 2005
Deliverables/Accomplishment:
  • Asbuilt data conversion and GPS field data verified over 5000km of utility gas pipeline and cadastre data migration.
Project Scopes:
  • Gas pipeline Inventory in SW GDO – Converted from ACAD format as well as from hardcopy drawings.
  • Cadaster landbase data migration and capturing – Acquire maps and migration from *shp format and/or captured new using google maps.
  • GPS Survey – Field equipment verification for critical components location and import ordinance coordinates into Smallworld.
Scroll to Top